This entire setup was less than $20. The brass fittings costing the most, I could not find PVC.

I tested the jetting process today. I got down about 16 feet. It feels like I am into some gravel. Since I was testing I did not rally want to spend more than an hour messing with it.

I did find out I need to drill a small hole in the tee fitting. This will let the air out and keep the rubber coupling from shooting off the end of the pipe. I plan on working some more tomorrow. Remember, I already have my pump.

Advertisements